AMP CRL Exam Overview:
| Certification Vendor: | Association of Asset Management Professionals (AMP) |
| Exam Name: | Certified Reliability Leader (CRL) Certification Exam |
| Exam Number: | CRL |
| Available Languages: | English, Spanish |
| Exam Price: | USD 399 |
| Real Exam Qty: | 125 |
| Exam Format: | Multiple-choice, Proctored, Online (virtual) |
| Certificate Validity Period: | 3 years |
| Exam Duration: | 120 minutes |
| Recommended Training: | Uptime Elements Academy / CRL Workshop (Reliabilityweb) |
| Exam Registration: | CRL Exam Registration |
| Sample Questions: | AMP CRL Sample Questions |
| Exam Way: | Primarily online, proctored virtual exam available in scheduled 24-hour windows; some in-person sessions may be available at conferences/events. |
| Pre Condition: | No formal prerequisites required. Candidates are expected to study the CRL Body of Knowledge or attend optional CRL workshops. |
| Official Syllabus URL: | https://assetmanagementprofessionals.org/certified-reliability-leader-exam/ |
AMP CRL Exam Syllabus Topics:
| Section | Objectives |
|---|---|
| Topic 1: UptimeĀ® Elements Reliability Framework | - Asset Management (AM) - Reliability Engineering for Maintenance (REM) - Work Execution Management (WEM) - Asset Condition Management (ACM) - Leadership for Reliability (LER) |
AMP Certified Reliability LeaderExam Sample Questions:
1. Which of the following does the Total Acid Number (TAN) represent?
A) Type of acid
B) Variety of acid
C) Volume of acid
2. Management of change involves controlling risks associated with introducing changes to:
A) people and organizational culture
B) organizational culture
C) assets, the organization, and its processes
3. Which of the following is a component of a fluid analysis test?
A) Total Friction Number
B) Total Acid Number
C) Total Flow Number
4. Which of the following percentages is attributed to the gains in labor productivity due to the improvement of maintenance efficiency and effectiveness through planning and scheduling?
A) Up to 50%
B) Up to 60%
C) Up to 30%
5. Which of the following is the reorder point of a spare part if it is determined that the organization needs a minimum of 100 pieces on hand and a safety stock of 25?
A) 4
B) 75
C) 125
Solutions:
| Question # 1 Answer: C | Question # 2 Answer: C | Question # 3 Answer: B | Question # 4 Answer: A | Question # 5 Answer: C |
We're so confident of our products that we provide no hassle product exchange.


By Isaac

