SAP C_TS420_1709 Exam Overview:
| Certification Vendor: | SAP |
|---|---|
| Exam Name: | SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing (1709) |
| Exam Number: | C_TS420_1709 |
| Exam Price: | $549 USD |
| Certificate Validity Period: | Retired; previously valid 5 years, extended 12 months after retirement |
| Passing Score: | 60% |
| Exam Duration: | 180 minutes |
| Exam Format: | Multiple Choice, Multiple Response |
| Related Certifications: | SAP Certified Application Associate - Production Planning & Manufacturing with SAP ERP 6.0 EHP6 SAP Certified Application Associate - Production Planning & Manufacturing with SAP ERP 6.0 EHP7 C_TS422_1809 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing |
| Real Exam Qty: | 80-92 |
| Available Languages: | English, Spanish, Simplified Chinese, German, Korean, Japanese |
| Recommended Training: | SCM130 - Planning and Manufacturing Overview SAP Learning Hub |
| Exam Registration: | Pearson VUE SAP Testing SAP Certification Hub SAP Training & Certification Shop |
| Sample Questions: | SAP C_TS420_1709 Sample Questions |
| Exam Way: | Online proctored via SAP Certification Hub or onsite at authorized testing centers; retired, no longer available for new registration |
| Pre Condition: | Basic knowledge of SAP S/4HANA, production planning, and manufacturing processes; no mandatory prerequisites |
| Official Syllabus URL: | https://training.sap.com/certification/c_ts420_1709-sap-certified-application-associate-sap-s-4hana-production-planning-and-manufacturing-1709/ |
SAP C_TS420_1709 Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| Advanced Planning in SAP S/4HANA | >12% | - Alert monitor and planning board - Detailed scheduling processes - Advanced planning concepts and master data |
| Material Requirements Planning in SAP ERP | >12% | - Long-term planning and master production scheduling - Planning strategies - MRP basics and run steps - Lot-sizing procedures |
| Lean Manufacturing and Kanban | <8% | - Kanban setup and control cycle - Repetitive manufacturing |
| Master Data in SAP S/4HANA | 8%-12% | - MRP areas and plant parameters - Material master, BOM, and routing - Work centers and production versions |
| Capacity Planning | 8%-12% | - Work center capacity checks - Capacity availability check - Capacity evaluation and leveling |
| Introduction to SAP S/4HANA | 8%-12% | - SAP Fiori UX and embedded analytics - SAP HANA database architecture - S/4HANA simplifications and innovations |
| Integration with Other Modules | <8% | - Integration with Sales and Distribution - Integration with Finance and Controlling |
| Demand Management | 8%-12% | - Planned independent requirements - Make-to-stock and make-to-order strategies - Consumption-based planning |
| Production Orders in SAP ERP | >12% | - Order status management - BOM item categories - Routing selection and order confirmation - Availability check and material staging |
SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing (1709) Sample Questions:
A warehouse manager likes to streamline the goods receipt (GR) process for production orders. Where
can you enable the automatic GR?
There are 2 correct answers to this question.
Response:
- A. Production scheduling profile
- B. Operation control key
- C. Scheduling margin key
- D. Confirmation profile
Correct Answer: A,B 🗳️
The setup time on the production line to produce a material is extensive. You would like to avoid
multiple setups and limit the production of the material based on a planning calendar.
Which type of lot size procedure should you use to accomplish this?
Please choose the correct answer.
Response:
- A. Exact lot sizing
- B. Periodic lot sizing
- C. Fixed lot sizing
- D. Minimum lot sizing
Correct Answer: B 🗳️
Which process order function uses a resource network?
Please choose the correct answer.
Response:
- A. Capacity leveling
- B. Capacity planning
- C. Resource selection
- D. Resource scheduling
Correct Answer: C 🗳️
Which of the following functions can be performed when the production order has the status "Created"
(CRTD)?
Please choose the correct answer.
Response:
- A. A user trigger printing of shop floor paper manually (transaction CO02).
- B. A user can trigger material staging via mass processing (transaction COHV).
- C. A user trigger material availability check via mass processing (transaction COHV)
- D. A user can schedule a background job to release production orders (transaction COOIS).
Correct Answer: A 🗳️
A planner updated a production order status from partially confirmed "PCNF" to technically completed
"TECO" by mistake.
What impact would this have to other users for this specific production order?
Please choose the correct answer.
Response:
- A. The buyer can still see component reservations
- B. The production operator cannot enter additional confirmations
- C. The warehouse clerk still carry out goods issue transactions
- D. The production manager can still see the capacity requirements
Correct Answer: B 🗳️
We're so confident of our products that we provide no hassle product exchange.


By Novia

