CTTAM Civil-Engineering-Technology Exam Overview:
| Certification Vendor: | CTTAM (Certified Technicians & Technologists Association of Manitoba) |
|---|---|
| Exam Name: | Technical Examination - Civil Engineering Technology C.E.T |
| Exam Number: | Civil-Engineering-Technology |
| Available Languages: | English |
| Related Certifications: | Certified Technician (C.Tech) Certified Engineering Technologist (C.E.T) Applied Science Technologist (A.Sc.T) |
| Exam Duration: | 180 minutes |
| Exam Format: | Written, Problem-solving, Essay |
| Certificate Validity Period: | Lifelong (with membership renewal) |
| Passing Score: | 60% |
| Exam Price: | CAD 250 |
| Sample Questions: | CTTAM Civil-Engineering-Technology Sample Questions |
| Exam Way: | Written examination (in-person) |
| Pre Condition: | Applicants must be a member of CTTAM (or apply for membership) and have graduated from a recognized civil engineering technology program or have equivalent work experience. |
| Official Syllabus URL: | https://cttam.com |
CTTAM Civil-Engineering-Technology Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| Topic 1: Surveying | 20% | - Measurement and calculation techniques
|
| Topic 2: Transportation Engineering | 20% | - Highway and road design
|
| Topic 3: Structural Design Fundamentals | 20% | - Structural analysis
|
| Topic 4: Materials Testing | 20% | - Soil mechanics and testing
|
| Topic 5: Municipal Engineering | 20% | - Wastewater and stormwater management
|
CTTAM Technical Examination - Civil Engineering Technology C.E.T Sample Questions:
Question 1
The critical path refers to which of the following series of tasks in a schedule?
A. Those that dictate the final cut and fills in a project
B. Those that dictate the final cost of a project
C. eect
D. Those that dictate the start date of a project
Question 2
In the middle of the project, the client proposed an additional scope of work that requires a change order to the contract. Which statement applies to the contractor's percentage fee (i.e., mark-up) that should be added to the total amount in the change order?
A. It is specified in the contract documents.
B. It varies depending on the size of the change contract.
C. It is determined by the owner.
D. It is determined by the contractor.
Question 3
Which of the following items appears on a record drawing?
A. Quantities for tender
B. Safety meeting minutes
C. Initial project estimates
D. Changes from the original construction documents
Question 4
What type of concrete structural element is shown in the image below?
A. Precast
B. Prestressed
C. Cast in place
D. Post-tensioned
Question 5
Which of the following correctly indicates the information that must be provided on a site plan?
A. Finish grades and setback distances
B. Finish grades and the legal description
C. The legal description
D. Finish grades, setback distances, and the legal description
Solutions:
| Question 1 Answer: C | Question 2 Answer: A | Question 3 Answer: D | Question 4 Answer: D | Question 5 Answer: D |