HP Support and Service HP StoreOnce Multinode Solutions Sample Questions:
1. Which statement is correct regarding the use of security erase jobs?
A) They will be run as part of housekeeping.
B) They will run once a week.
C) They are initiated by the backup software.
D) They are scheduled by the administrator.
2. On an HP StoreOnce Multi-node Backup system, what must be done before performing a firmware upgrade on the P1228 RAID controller?
A) Shut down the other node.
B) Disable failover.
C) Perform a manual failover to the other node.
D) Shut down service sets.
3. Your customer has a requirement for trending and alerting information of their HP StoreOnce Backup system. How can your customer perform this function?
A) Install HP OneView.
B) Configure reporting within the StoreOnce GUI.
C) Install StoreOnce Enterprise Manager
D) Configure SNMP alerting.
4. Which elements are included in the HP StoreOnce Security Pack? (Select two.)
A) policy-based access control
B) WORM retention functionality
C) Secure Erase functionality
D) data-in-flight replication encryption
E) data-at-rest encryption
5. Your customer's environment consists of an HP 3PAR StoreServ 7200 and HP BladeSystems with Flex-10 connected via HPN 5900 network switches with IRF. Their backup architecture requires VTL, and their capacity requirements make the HP StoreOnce 6500 Backup system their only option. Which planning consideration must you advise your customer on?
A) The HP StoreOnce 6500 Backup system requires a dedicated Flex-10 Shared Uplink Set (SUS).
B) The HP network switch is not supported with HP StoreOnce 6500 Backup systems.
C) The Virtual Connect Flex-10 module needs to upgrade to Flex-10/D.
D) The HP StoreOnce 6500 Backup system only supports FC host interfaces,
Solutions:
| Question # 1 Answer: D | Question # 2 Answer: D | Question # 3 Answer: C | Question # 4 Answer: C,E | Question # 5 Answer: D |
We're so confident of our products that we provide no hassle product exchange.


By Natalie

