[May-2026] SAP C-TS422-2504 Test Engine PDF - All Free Dumps from SurePassExams [Q46-Q65]

Share

[May-2026] SAP C-TS422-2504 Test Engine PDF - All Free Dumps from SurePassExams

Get New C-TS422-2504 Certification – Valid Exam Dumps Questions

NEW QUESTION # 46
Where do you maintain the work center that represents the production line for repetitive manufacturing? Note: There are 2 correct answers to this question.

  • A. Production version
  • B. Routing
  • C. Repetitive manufacturing profile
  • D. Production cost collector

Answer: A,B


NEW QUESTION # 47
Which of the following processes lead to an indicator in the planning file?
Note: There are 2 correct answers to this question.

  • A. Changing a dependent requirement
  • B. Changing a storage bin
  • C. Changing a delivery address
  • D. Changing an operation time

Answer: A,D


NEW QUESTION # 48
Which objects can you change with a change number?
Note: There are 2 correct answers to this question.

  • A. Routings
  • B. Work center
  • C. Production order
  • D. Bill of material

Answer: A,D


NEW QUESTION # 49
Your company manufactures materials whose characteristics differ for each manufacturing process.
Which application do you choose in SAP S/4HANA to track and use this information in all areas of logistics?

  • A. Process order management
  • B. Batch management
  • C. Quality management
  • D. Engineering change management

Answer: B


NEW QUESTION # 50
Which time elements does MRP consider in backward scheduling to determine the basic dates for components from dependent requirements? Note: There are 2 correct answers to this question.

  • A. Planned delivery time
  • B. Total replenishment lead time
  • C. Operation duration
  • D. In-house production time

Answer: A,D


NEW QUESTION # 51
Which time elements are relevant for lead time scheduling of a production order? Note: There are 2 correct answers to this question.

  • A. Total replenishment lead time
  • B. Opening period
  • C. Setup time
  • D. Float after production

Answer: C,D


NEW QUESTION # 52
Which standard item categories can you select inside a bill of material (BOM)?
Note: There are 2 correct answers to this question.

  • A. Non-plant item
  • B. WBS item
  • C. Class item
  • D. Work item

Answer: A,C


NEW QUESTION # 53
Which of the following automation options can you use for production orders? Note: There are 2 correct answers to this question.

  • A. You can use the production scheduling profile to automatically set orders to technically complete.
  • B. You can use mass processing to set production orders to technically complete.
  • C. You can use mass processing to read PP master data for production orders.
  • D. You can use trigger points to automatically create rework orders via confirmations.

Answer: B,D


NEW QUESTION # 54
Why would you use phantom assemblies?
Note: There are 3 correct answers to this question.

  • A. To reduce the number of material masters
  • B. To make the assignment of components easier
  • C. To simplify the structure of bills of material
  • D. To reduce the number of changes required in bills of material
  • E. To increase the number of planning levels

Answer: B,C,D


NEW QUESTION # 55
What information do you have to maintain to define the relationship between supply source dem source in the Kanban process? Note: There are 2 correct answers to this question.

  • A. Replenishment strategy
  • B. Routing
  • C. Work Center
  • D. Production supply area

Answer: A,D


NEW QUESTION # 56
Your company manufactures materials whose characteristics differ for each manufacturing process.
Which application do you have to use in SAP S/4HANA Cloud Private Edition to be able to track use this information in all areas of logistics?

  • A. Process order management
  • B. Batch management
  • C. Quality management
  • D. Engineering change management

Answer: B


NEW QUESTION # 57
What can you use standard heuristics in Advanced Planning (PP/DS) for?

  • A. To optimize costs and times in production plans
  • B. To solve planning problems for defined objects
  • C. To set default values in production master data
  • D. To automate material movements in material staging

Answer: B


NEW QUESTION # 58
Your project team decides to use a make-to-order planning strategy for a strategic material in discrete manufacturing. What are the impacts of this decision?
Note: There are 3 correct answers to this question.

  • A. Sales orders have to be ATP-confirmed (available-to-promise) to be saved.
  • B. Production and procurement costs are managed on the sales order item level.
  • C. Storage location MRP areas are required to manage sales-order-specific stock.
  • D. Planned orders are created in MRP with reference to sales orders.
  • E. Net requirements calculation is carried out for every sales order individually.

Answer: B,D,E


NEW QUESTION # 59
You want to set up a make-to-order planning scenario for a finished product. The bill of material contains two components: one should be procured for each sales order individually, and the other should be procured jointly for all independent requirements. Forecasting for the finished product is NOT possible. Which settings do you make to achieve this?

  • A. Choose planning strategy 20 (Make-to-Order) and select the corresponding Individual/Collective indicator
  • B. Choose planning strategy 50 (Planning without final assembly) and select the corresponding Individual/Collective indicator
  • C. Choose planning strategy 50 (Planning without final assembly) and select the corresponding Mixed MRP indicator
  • D. Choose planning strategy 20 (Make-to-Order) and select the corresponding Mixed MRP indicator

Answer: A


NEW QUESTION # 60
How would you define a pegging structure for an order in the context of Advanced Planning?

  • A. An evaluation to identify material or capacity shortages in the bill-of-material structure after the production planning run
  • B. An evaluation to identify overstock situations based on the assignment of receipt and issue elements after the production planning run
  • C. An evaluation that is ordered according to the low-level codes of all related products and represents the coverage of issue elements with receipt elements and stock
  • D. An evaluation that is ordered according to the bill-of-material structure of all related products and represents the relationship between receipt and issue elements

Answer: D


NEW QUESTION # 61
Which chart types does the tabular planning table for capacity planning provide in SAP S/4HANA Cloud Private Edition?
Note: There are 2 correct answers to this question.

  • A. Order (pool) chart
  • B. Order (dispatched) chart
  • C. Capacity requirements chart
  • D. Work center capacities chart

Answer: C,D


NEW QUESTION # 62
What is the purpose of the pull list in material staging?

  • A. To control the flow of material from the central storage location to the production storage location
  • B. To control the flow of material from the supplier to the production storage location
  • C. To control the flow of material from the supplier to the central storage location
  • D. To control the flow of material from the production storage location to the central storage location

Answer: A


NEW QUESTION # 63
In documentation for MRP in Advanced Planning you read that new orders are created through infinite planning. What does this mean for the capacity requirements of a new order?

  • A. MRP assigns the capacity requirements automatically after the last scheduled operation for each work center.
  • B. MRP creates the capacity requirements without considering existing load on the work centers.
  • C. MRP assigns the capacity requirements automatically to work centers with the earliest available capacity.
  • D. MRP creates the capacity requirements at the earliest possible time.

Answer: A


NEW QUESTION # 64
You want to create a production order. What methods can you use?
Note: There are 2 correct answers to this question.

  • A. Create by order release
  • B. Create in Kanban process
  • C. Convert a purchase requisition
  • D. Create without material

Answer: B,D


NEW QUESTION # 65
......

100% Passing Guarantee - Brilliant C-TS422-2504 Exam Questions PDF: https://dumpsninja.surepassexams.com/C-TS422-2504-exam-bootcamp.html